Retraction

The key operation ascertaining of armored equipment parts batch-repair progress for quality monitoring based on FCE

Paper Information

Record ID:
30706
Publication Date:
July 15, 2013
Retraction Date:
October 10, 2013 (12.1 years years ago)
Publisher:
IEEE: Institute of Electrical and Electronics Engineers
Open Access:
Yes
PubMed ID:
Not indexed in PubMed
Retraction PubMed ID:
Not indexed in PubMed

Retraction Details

Nature of Retraction:

Retraction

Citations (1)

1
Total Citations
1
Post-Retraction
(100.0%)
0
Pre-Retraction
0
Same Day
Post-Retraction Citation Analysis
0 Within 30 days
0 Within 1 year
1 After 2+ years
2216 Days since retraction (latest)
Paper citing Decision-making model for ranking battlefield dama...
Unknown Authors
Unknown Journal
Published: Nov 2019
2216 days after retraction
Quick Stats
Total Citations: 1
Years Since Retraction: 12.1 years
Open Access: Yes
Last Checked: Never
Related Papers
Evaluation of the producer-consumer problem
2013 International Conference on Quality, Reliability, Risk, Maintenance, and Safety Engineering • 1 citations
TIC: A methodology for the construction of E-Commerce
2013 International Conference on Quality, Reliability, Risk, Maintenance, and Safety Engineering • 0 citations
Failure analysis for the mechanical system of autonomous un…
2013 International Conference on Quality, Reliability, Risk, Maintenance, and Safety Engineering • 5 citations
Research on the wear life of slipper in aero-hydraulic pump…
2013 International Conference on Quality, Reliability, Risk, Maintenance, and Safety Engineering • 5 citations
Comprehensive analysis of system reliability and maintenanc…
2013 International Conference on Quality, Reliability, Risk, Maintenance, and Safety Engineering • 5 citations