Retraction
Building Construction Design Based on Particle Swarm Optimization Algorithm
Paper Information
Record ID:
51898
Author(s):
Journal:
Publication Date:
June 29, 2022
Retraction Date:
August 16, 2023
(2.3 years years ago)
Subjects:
Institution:
Department of Undergraduate Education, Anhui Water Conservancy Technical College, Hefei, Anhui 231600, ChinaCountry:
🇨🇳 ChinaArticle Type:
Publisher:
Hindawi
Open Access:
Yes
DOI:
PubMed ID:
Not indexed in PubMed
Retraction PubMed ID:
Not indexed in PubMed
Retraction Details
Retraction Reasons:
- Concerns/Issues About Data
- Concerns/Issues about Results and/or Conclusions
- Concerns/Issues about Referencing/Attributions
- Concerns/Issues with Peer Review
- Investigation by Journal/Publisher
- Investigation by Third Party
- Paper Mill
- Computer-Aided Content or Computer-Generated Content
- Unreliable Results and/or Conclusions
Nature of Retraction:
Retraction
Retraction Notice:
10.1155/2023/9823945Additional Notes:
See also: https://pubpeer.com/publications/906E901FADE9843ACAA20B0C4FCB26
Citations (6)
6
Total Citations3
Post-Retraction(50.0%)
1
Pre-Retraction1
Same DayPost-Retraction Citation Analysis
0
Within 30 days
2
Within 1 year
0
After 2+ years
624
Days since retraction (latest)
Heavy Metals Removal Using Carbon Based Nanocomposites
Unknown Authors
Unknown Journal
Published: Unknown
Artificial intelligence in risk management within the realm of construction projects: A bibliometric analysis and systematic literature review
Kun Tian, Zicheng Zhu, Jasper Mbachu et al. (5 authors)
Journal of Innovation & Knowledge
Open Access
Published: May 2025
624 days after retraction
A Review of Critical Factors of Successfully Implementing IBS in China Based on Scopus Database
Xiaonuo Kang, Kenn Jhun Kam
Advances in civil and industrial engineering book series
Published: Jun 2024
317 days after retraction
An Innovative Model of English Teaching Based on Particle Swarm Algorithm Construction
Yingying Yang
Deleted Journal
Open Access
Published: Apr 2024
1 citation
1 citation
232 days after retraction
Retracted: Building Construction Design Based on Particle Swarm Optimization Algorithm
Journal of Control Science and Engineering
Journal of Control Science and Engineering
Open Access
Published: Aug 2023
Same day as retraction
Integrate computation intelligence with Bayes theorem into complex construction installation: a heuristic two-stage resource scheduling optimisation approach
Jia Zhao, Wenhao Wang, Liyuan Zhang et al. (4 authors)
Connection Science
Open Access
Published: Mar 2023
156 days before retraction
Quick Stats
Total Citations:
9
Years Since Retraction:
2.3 years
Open Access:
Yes
Last Checked:
Jul 24, 2025