Retraction
An improved quantum particle swarm algorithm for solving multi-objective fuzzy flexible job shop scheduling problem
Paper Information
Record ID:
65003
Author(s):
Publication Date:
July 05, 2023
Retraction Date:
January 15, 2025
(<1 year years ago)
Subjects:
Institutions:
- School of Mechanical Engineering, Hebei University of Technology, Tianjin, China
- Tianjin Key Laboratory of Power Transmission and Safety Technology for New Energy Vehicles, School of Mechanical Engineering, Hebei University of Technology, Tianjin, China
- Career Leader Intelligent Control Automation Company, SuQian, Jiangsu Province, China
- School of Mechanical Engineering, Hebei University of Technology, Tianjin, China
Country:
🇨🇳 ChinaArticle Type:
Publisher:
IOS Press (bought by Sage November 2023)
Open Access:
Yes
DOI:
PubMed ID:
Not indexed in PubMed
Retraction PubMed ID:
Not indexed in PubMed
Retraction Details
Retraction Reasons:
- Computer-Aided Content or Computer-Generated Content
- Concerns/Issues About Authorship/Affiliation
- Concerns/Issues about Referencing/Attributions
- Concerns/Issues about Third Party Involvement
- Fake Peer Review
- Investigation by Journal/Publisher
- Investigation by Third Party
- Paper Mill
- Unreliable Results and/or Conclusions
Nature of Retraction:
Retraction
Retraction Notice:
10.3233/JIFS-219434Citations (4)
4
Total Citations1
Post-Retraction(25.0%)
2
Pre-Retraction0
Same DayPost-Retraction Citation Analysis
0
Within 30 days
1
Within 1 year
0
After 2+ years
173
Days since retraction (latest)
Heavy Metals Removal Using Carbon Based Nanocomposites
Unknown Authors
Unknown Journal
Published: Unknown
A Hybrid Energy-Saving Scheduling Method Integrating Machine Tool Intermittent State Control for Workshops
Hong Cheng, Haixiao Liu, Shuo Zhu et al. (5 authors)
Sustainability
Open Access
Published: Jul 2025
173 days after retraction
Many-objective flexible job-shop scheduling based on a loose non-dominated sorting genetic algorithm
Zhenyu Liu, Hao Liu, Hui Liu et al. (4 authors)
Engineering Optimization
Published: Jun 2024
3 citations
3 citations
222 days before retraction
A reinforcement learning enhanced memetic algorithm for multi-objective flexible job shop scheduling toward Industry 5.0
Xiao Chang, Xiaoliang Jia, Jiahao Ren
International Journal of Production Research
Published: May 2024
18 citations
18 citations
230 days before retraction
Quick Stats
Total Citations:
4
Years Since Retraction:
<1 year
Open Access:
Yes
Last Checked:
Jul 23, 2025